2 views
21 seconds ago

Submer report shows GCC AI build-out depends on deployment capability

Sami Alfaraj, Field CTO, Submer MEA.
Sami Alfaraj, Field CTO, Submer MEA.

Submer has released its GCC AI and HPC Infrastructure Report, revealing that the region’s US$93 billion data centre pipeline is constrained by power, cooling and operational delivery rather than capital or access to advanced chips. Capacity is expected to reach 3.3GW by 2030, driven by rising rack densities and liquid-cooling demands in extreme ambient temperatures.

GCC data centre capacity is expected to grow from approximately 1GW today to 3.3GW by 2030, according to a forecast by FTI Consulting echoed by PwC Middle East. The regional data centre pipeline now exceeds US$93 billion across more than 174 tracked projects. Access to compute is expanding in parallel. In November 2025 the United States authorised exports of up to 35,000 NVIDIA Blackwell chips each to Saudi Arabia’s HUMAIN and the UAE’s G42, and HUMAIN plans to deploy up to 600,000 NVIDIA GPUs over the next three years.

“The GCC has the ambition, the capital and increasingly the chips. What it needs now is the capability to turn them into reliable, operational AI capacity,” said Sami Alfaraj, Field CTO, Submer MEA, and author of the report. “The infrastructure decisions made in this cycle will determine whether the region’s AI platforms can scale economically, reliably and sustainably.”

The report closely links power and heat. Securing grid capacity now takes longer than building the physical site. Regardless of capital, it is substations, transmission upgrades and commissioning that dictate delivery timelines. At the same time, AI rack densities are moving from 30kW towards 150kW. A single NVIDIA GB300 NVL72 rack draws roughly 132 to 135kW and up to about 155kW at peak, and is liquid-cooled by design. Because advanced thermal solutions reduce facility overhead, the report positions thermal efficiency as a way to extract more compute from the same grid allocation.

Water is the other physical constraint. Saudi data centres reportedly consumed around 15 billion litres of water in 2024, in a region that depends on energy-intensive desalination. The report notes that there is currently no binding GCC-wide mandate on water or energy efficiency. The pressure is commercial. Closed-loop thermal solutions can achieve zero direct water consumption even under extreme heat loads, giving operators structurally lower operating costs and fewer siting constraints.

The report also sets out five further findings.

  • Hybrid thermal architectures will become standard. Direct-to-chip accounted for 42.85% of liquid-cooling revenue in 2025, while immersion supports densities above 100kW per rack and can achieve PUE levels of 1.02 to 1.03. The report expects operators to combine direct-to-chip, immersion and rear-door heat exchangers within a single facility.
  • Sovereignty is being redefined. Storing data inside national borders is now basic compliance. The report defines true AI sovereignty as operational independence, the ability to build, operate and maintain critical AI infrastructure locally.
  • Buyers want single accountability. AI infrastructure has become too complex to procure as separate components. Sovereign and enterprise buyers increasingly prefer one partner accountable across thermal, mechanical and IT systems, from design through to operations.
  • Facilities must be vendor-neutral. With AMD reporting US$5.8 billion in data centre revenue in Q1 2026, up 57% year on year, and hyperscaler custom silicon growing fast, sites must support NVIDIA, AMD and custom chips with different power and thermal profiles.
  • The market will mature in three stages. First large-scale AI capacity enters production in 2026–2027, scale and sustainability converge in 2027–2028, and the GCC matures into a sovereign AI and export-compute hub for the Middle East and Africa by 2028–2030.

“Sovereign and enterprise buyers are procuring AI infrastructure faster than they can build the in-house expertise to specify, integrate and operate it,” continued Alfaraj. “When one partner is answerable for thermal, mechanical and IT as a single system, delivery risk falls and the path from specification to live capacity becomes shorter and more predictable. That accountable capability, more than capital or chips, is now the scarce resource.”

Submer works with GCC governments, sovereign funds, operators and enterprises across advisory, design and engineering, IT infrastructure integration, power and thermal solutions and modular data centre solutions. With its regional headquarters in Saudi Arabia, a UAE team and dedicated MEA leadership, its thermal solutions support densities above 100kW per rack and closed-loop operation with zero direct water consumption, suited to hot and arid environments.

The GCC AI & HPC Infrastructure Report covers Saudi Arabia, the United Arab Emirates, Qatar, Kuwait, Bahrain and Oman. It uses 2026 as its base year, with a forward view to 2030, and combines publicly available market data, government and operator announcements and analyst forecasts. Market-size figures described as modelled are Submer estimates based on stated assumptions and should be read as decision-support ranges.

Leave a Reply

Latest from Blog

Welcome to

By signing or creating an account you agree with our Code of conduct & Privacy policy